Setup Guide
Figure 16. Switch rail attachment
2. After you install both rails, line them up on the ReadyRails. Slide the switch in until it is flush with the front of rack.
About three inches before you fully insert your switch, the rail locking feature engages to keep the switch from inadvertently sliding
out and falling.
Figure 17. Front rack installation
NOTE:
Do not the use the mounted Ready-Rails as a shelf or a workplace.
S5200F-ON Series switch Installation 17