Users Guide

Installation 11
4
Installation
Unpacking the Switch
This section describes the package contents and the steps to unpack the S6000-
ON switch.
Package Contents
When unpacking each switch, make sure that the following items are included:
One S6000-ON switch
One RJ-45 to DB-9 female cable
Two sets of rail kits (no tools required)
Two PSUs
One AC power cord (country/region specific)
Getting Started Guide
Safety and Regulatory Information
Warranty and Support Information
Software License Agreement
Unpacking Steps
NOTE: Before unpacking the switch, inspect the container and immediately report
any evidence of damage.
Step Task
1
Place the container on a clean, flat surface and cut all straps securing the container.
2
Open the container or remove the container top.
3
Carefully remove the switch from the container and place it on a secure and clean
surface.
4
Remove all packing material.
5
Inspect the product and accessories for damage.