Install Guide
Site preparations
The S6000–ON is suitable for installation as part of a common bond network (CBN).
You can install the system in:
• Network telecommunication facilities
• Data centers
• Other locations where the National Electric Code (NEC) applies
For more information about S6000–ON specications, see Specications.
NOTE: Install the S6000–ON system into a rack or cabinet before installing any optional components.
Topics:
• Site selection
• Cabinet placement
• Rack mounting
• Grounding
• Fans and airow
• Power
• Storing components
Site selection
Install Dell EMC equipment in restricted access areas.
A restricted access area is one where service personnel can only gain access using a special tool, lock, key or other means of security and 
access is controlled by the authority responsible for the location.
Ensure that the area where you install your S6000–ON system meets the following safety requirements:
• Near an adequate power source. Connect the system to the appropriate branch circuit protection as dened by your local electrical 
codes.
• Environmental temperature between 32° to 113°F—from 0° to 45°C.
• Relative humidity that does not exceed 90 percent noncondensing.
• In a dry, clean, well-ventilated and temperature-controlled room, away from heat sources such as hot air vents or direct sunlight.
• Away from sources of severe electromagnetic noise.
• Positioned in a rack or cabinet, or on a desktop with adequate space in the front, rear, and sides of the S6000–ON for proper 
ventilation and access.
Cabinet placement
Install the S6000–ON only in indoor cabinets designed for use in a controlled environment.
Do not install the S6000–ON in outside plant cabinets. For cabinet placement requirements, see Site Selection.
3
Site preparations 11