Install Guide
Figure 6. 1U tool-less conguration
2  Align and seat the front ange pegs in the holes on the front side of the vertical post, item 2.
3  Repeat this procedure for the second rail.
4  To remove each rail, pull on the latch release button on each ange ear and unseat each rail, item 3.
Two-post ush-mount conguration
CAUTION
: Your system is not NEBS Earthquake Z4-compliant if you use this installation method.
1  Remove the tool-less latch castings from the front side of each ReadyRails assembly, item 1.
Use a Torx driver to remove the two screws from each front ange ear on the switch side of the rail. Remove each latch casting. 
Retain the castings for future rack requirements. It is not necessary to remove the rear ange castings.
S6000–ON installation
17










