Install Guide

Figure 6. 1U tool-less conguration
2 Align and seat the front ange pegs in the holes on the front side of the vertical post, item 2.
3 Repeat this procedure for the second rail.
4 To remove each rail, pull on the latch release button on each ange ear and unseat each rail, item 3.
Two-post ush-mount conguration
CAUTION
: Your system is not NEBS Earthquake Z4-compliant if you use this installation method.
1 Remove the tool-less latch castings from the front side of each ReadyRails assembly, item 1.
Use a Torx driver to remove the two screws from each front ange ear on the switch side of the rail. Remove each latch casting.
Retain the castings for future rack requirements. It is not necessary to remove the rear ange castings.
S6000–ON installation
17