Install Guide
Figure 10. Attaching the Switch Rails
2  After you have installed both switch rails, line them up on the previously mounted Ready-Rails and slide the switch in until it is ush 
with front of rack. About three inches prior to full insertion, the rail locking feature engages to keep the switch from inadvertently 
sliding out of the rack and falling.
Figure 11. Front Rack Installation
NOTE
: Do not the use the mounted Ready-Rails as a shelf or a workplace.
S6000–ON installation 21