Install Guide
Table Of Contents
- Dell EMC PowerSwitch Z9264F-ON Installation Guide August 2021
 - Contents
 - About this guide
 - Z9264F-ON switch
 - Site preparations
 - NEBS compliance
 - Z9264F-ON switch installation
 - Power supplies
 - Fans
 - Management ports
 - Before you install an OS
 - Specifications
- Chassis physical design
 - IEEE standards
 - Agency compliance
 - USA Federal Communications Commission FCC statement
 - European Union EMC directive conformance statement
 - Japan VCCI compliance for class A equipment
 - Korean certification of compliance
 - China warning
 - Safety standards and compliance agency certifications
 - Electromagnetic compatibility
 - Product recycling and disposal
 
 - Dell EMC support
 
Figure 14. Front rack installation
NOTE: Do not the use the mounted rack rails as a shelf or a workplace.
3. Tighten the two thumbscrews and rack screws.
To remove the switch from the rack or cabinet, press in the two side-release bars on the switch simultaneously and slide the
switch forward.
Optics installation
The Z9264F-ON switch has QSFP28 and SFP+ optical ports.
For a list of supported optics, see the specification sheets at www.dell.com/support or contact your Dell EMC Sales
representative.
CAUTION:
 ESD damage can occur if components are mishandled. Always wear an ESD-preventive wrist or heel
ground strap when handling the Z9264F-ON switch and components.
WARNING: When working with optical fibers, follow all warning labels and always wear eye protection. Never
look directly into the end of a terminated or unterminated fiber or connector as it may cause eye damage.
1. Position the optic to enter the port correctly.
The optic has a key that prevents it from being inserted incorrectly.
2. Insert the optic into the port until it gently snaps into place.
NOTE:
 When you cable the ports, be sure not to interfere with the airflow from the small vent holes above and below
the ports.
Z9264F-ON switch installation 23










