Install Guide

About this guide
This guide provides site preparation recommendations, step-by-step procedures for rack mounting and desk mounting your
switch, inserting modules, and connecting to a power source.
CAUTION: To avoid electrostatic discharge (ESD) damage, wear grounding wrist straps when handling this
equipment.
NOTE: Only trained and qualified personnel can install this equipment. Read this guide before you install and power up this
equipment. This equipment contains two power cords. Disconnect both power cords before servicing.
NOTE: This equipment contains optical transceivers, which comply with the limits of Class 1 laser radiation.
Figure 1. Class 1 laser product tag
NOTE: When no cable is connected, visible and invisible laser radiation may emit from the aperture of the optical
transceiver ports. Avoid exposure to laser radiation. Do not stare into open apertures.
Regulatory
Marketing model Z9264F-ON is represented by the regulatory model E23W and the regulatory type E23W002.
Topics:
Related documents
Related documents
For more information about the Z9264F-ON switch, see the following documents:
Dell EMC SmartFabric User Guide
Dell EMC SmartFabric Release Notes
Dell EMC PowerSwitch Z9264F-ON Set-up Guide
Dell EMC PowerSwitch Z9264F-ON Release Notes
Open Networking Hardware Diagnostic Guide
Enterprise SONiC Distribution by Dell Technologies User Guide
Release Notes for Enterprise SONiC Distribution by Dell Technologies
NOTE:
To access product documentation for specific Dell EMC PowerSwitches, see the Dell EMC Networking OS10 Info
Hub. For all other resources, see Dell EMC support: www.dell.com/support.
1
About this guide 5