Setup Guide

Optics removal
Remove an optic by pushing the tab on the optic and sliding the optic from the port.
When removing optics with direct attach cables (DACs) from the port, pull the release tab firmly and steadily. Before pulling
the release tab, you may need to gently push the optic into the port to ensure that it is seated properly. Do not jerk or tug
repeatedly on the tab.
Switch startup
Supply power to the Z9264F-ON switch after you mount it in a rack or cabinet.
Reinspect your switch before power on. Verify the following:
Optional: The equipment is secured to the rack and properly grounded.
Optional: The equipment rack is properly mounted and grounded.
The ambient temperature around the unit, which may be higher than the room temperature, is within the limits that are
specified for the Z9264F-ON switch, see Specifications.
There is sufficient airflow around the unit.
The input circuits are correctly sized for the loads and that you use sufficient overcurrent protection devices.
All protective covers are in place.
CAUTION: Do not power on the switch if you did not install a fan module.
NOTE: A US AC power cable is included for powering up an AC power supply. You must order all other power cables
separately.
NOTE: ESD damage can occur if components are mishandled. Always wear an ESD-preventive wrist or heel ground strap
when handling the switch and its components.
Power up sequence
When the switch powers up, the fans immediately come on at high speed. The fan speed slows as the switch continues to boot.
After switch installation
After you have securely installed and powered on the Z9264F-ON switch:
If you are using Dell EMC software, see switch documentation at www.dell.com/support/.
If you need ONIE information, see ONIE documentation at www.onie.org.
If you are using third-party software, see your third-party documentation.
12
Z9264F-ON switch installation