Setup Guide

The switch includes two installed M4 screws on the lower-left side of your switch. The DC switch also includes an assembled UL-certified
GND lug with bracket, which is packaged separately. The AC switch does not include the UL-certified GND lug. If any parts are missing,
contact your Dell EMC sales representative.
The ground cable is not included. To properly ground the switch, Dell EMC recommends a one- or two-hole lug, M4 hole size. The
grounding lugs must be a UL-recognized, crimp-type lug.
CAUTION: Grounding conductors
must
be made of copper. Do not use aluminum conductors.
NOTE: Coat the ground lug assembly with an anti-oxidant compound before crimping. Also, bring any unplated mating
surfaces to a clean finish and coat with an anti-oxidant before mating. Plated mating surfaces must be clean and free
from contamination.
1. Remove the two installed M4 screws from the lower-left side of your switch.
NOTE:
Keep these screws.
2. Remove the bracket assembly from the shipping bag.
Figure 2. Ground lug assembly
3. Measure and cut a length of ground wire sufficient to reach between the system-installed ground lug assembly and your rack ground
point.
4. Crimp the ground cable to the ground lug assembly.
a) Coat the bare end of the wire with an anti-oxidant compound.
b) Insert the end of the wire into the ground lug.
c) Crimp the ground lug end.
5. Clean the bracket and lug surfaces thoroughly, and apply an anti-oxidant solution to the mating surfaces.
6. Attach the switch ground lug assembly to the switch.
Figure 3. Ground lug assembly attached
7. Attach the GND lug bracket assembly to your switch using the two removed screws, as shown.
Torque the M4 screws to ±8–10 in-lbs.
Z9264F-ON switch installation
9