Dell Networking S4810–Open Networking (ON) Getting Started Guide Regulatory Model: S4810
Notes, Cautions, and Warnings NOTE: A NOTE indicates important information that helps you make better use of your computer. CAUTION: A CAUTION indicates either potential damage to hardware or loss of data and tells you how to avoid the problem. WARNING: A WARNING indicates a potential for property damage, personal injury, or death. Copyright © 2014 Dell Inc. All rights reserved. This product is protected by U.S. and international copyright and intellectual property laws.
Contents 1 About this Guide........................................................................................................ 5 2 Install the Hardware................................................................................................. 7 Install the Chassis.................................................................................................................................. 7 Attaching the Mounting Brackets.........................................................................
About this Guide 1 This document is intended as a Quick Start Guide to get new systems up and running and ready for configuration. For complete installation information, refer to Installing the S4810–Open Network (ON) System.
Install the Hardware 2 Before installing the switch, verify that you meet these guidelines: • You have enough clearance to the front of the switch so you can read the light emitting diodes (LEDs). • The AC power cord reaches from the power outlet to the Utility-panel connector. • The switch is rack-mounted before you power it up. • Cabling is away from sources of electrical noise, such as radios, power lines, and fluorescent lighting.
Attaching the Mounting Brackets The S4810–ON is shipped with mounting brackets (rack ears) and the required screws for rack or cabinet installation. The brackets are enclosed in a package with the chassis. 1. Take the brackets and screws out of their packaging. 2. Attach the brackets to the sides of the chassis at the power supply unit (PSU) end, using four screws for each bracket. Attach the bracket so that the “ear” faces to the PSU and the outside of the chassis. Figure 1.
• Reverse air flow — To ensure cool air intake and to avoid hot air blow out from the I/O panel, ensure you have the necessary clearance. • Reliable earthing — Maintain reliable earthing of rack-mounted equipment. Pay particular attention to the supply connections other than the direct connections to the branch circuit; for example, the use of the power strips. • Do not mount the equipment with the Utility panel facing in the downward position. NOTE: These instructions are a condensed reference.
CAUTION: Grounding conductors must be made of copper. Do not use aluminum conductors. NOTE: Coat the one-hole lug with an anti-oxidant compound prior to crimping. Bring any unplated mating surfaces to a shiny finish, and coat with an anti-oxidant prior to mating. Plated mating surfaces must be clean and free from contamination. 1. Cut the ground cable to the desired length. The cable length must facilitate the proper operation of fault interrupt circuits.
Installing AC Power Supplies 1. Remove the PSU from the electro-static bag. 2. Use the grab handle to slide the PSU into the switch PSU slot. Figure 4. Install the AC Power Supply Unit 3. Tighten the securing screws on the PSU. 4. Attach the power cables. NOTE: The system is powered-up as soon as you connect the power cord between the system and the power source. 5. Repeat steps 1 through 4 for the second PSU. NOTE: Ensure that the PSU is correctly installed.
CAUTION: Check the fans at six-month intervals and replace them as necessary. To accurately determine replacement intervals, regularly monitor the speeds of the cooling fans. Installing the SFP+ and QSFP+ Optics The S4810–ON has 48 small form-factor pluggable plus (SFP+) optical ports and four quad small formfactor pluggable plus (QSFP+) optical ports. For a list of supported optics, refer to the S4810–ON data sheet at www.dell.com or contact your Dell Networking representative.
AC Power CAUTION: Ensure that the PSU is installed correctly. The AC power connector must be on the left side of the PSU and the status LED at the top of the PSU. Connect the plug to each AC power connector. Make sure that the power cord is secure. As soon as the cable is connected between the S4810–ON and the power source, the switch is poweredup; there is no on/off switch.
Technical Specifications 3 NOTE: Operate the system at an ambient temperature not higher than 40°C. CAUTION: Lithium Battery Caution: There is a danger of explosion if the battery is incorrectly replaced. NOTE: Replace the battery only with the same or an equivalent type. Dispose of the batteries according to the manufacturer's instructions. Table 1. S4810–ON Chassis Physical Design Parameter Specifications Height 1.73 inches (4.4 cm) Width 17.32 inches (44.0 cm) Depth 18.11 inches (47.
Parameter Specifications Maximum system power input 350 Watts (AC) 16 Technical Specifications