4. From the Storage tab navigation pane, select a volume.
The volume must be the source of a replication relationship.
5. Click Create Schedule.
The Create Schedule dialog box opens.
6. Click the Enable Schedule checkbox.
7. In the Name eld, type a name for the schedule.
8. From the Frequency drop-down menu, select Daily Schedule.
9. Select the Replication Schedule radio button.
10. From the Start Date drop-down menu, select the start date of the schedule.
11. To enable an end date for the schedule, select the checkbox next to End Date then select a date from the End Date drop-down
menu.
12. In the Run every eld, specify the how often to run the replication.
13. Specify the when to start the replication.
To start the replication at a set time each day, select At specic time, then select a time of day.
To repeat the replication over a set amount of time, select Repeat Interval, then select how often to start replication and
the start and end times.
14. From the Replica Settings eld, type the maximum number of replications the schedule can initiate.
Schedule a Replication to Run Once
Create a schedule for one replication to replicate the volume at a future date and time.
1. Click the Storage view.
2. In the Storage pane, select a PS Series group.
3. Click the Storage tab.
4. From the Storage tab navigation pane, select a volume.
The volume must be the source of a replication relationship.
5. Click Create Schedule.
The Create Schedule dialog box opens.
6. Click the Enable Schedule checkbox.
7. In the Name eld, type a name for the schedule.
8. From the Frequency drop-down menu, select Run Once.
9. From the Date eld, select the start date of the replication.
10. In the Time eld, specify the start time of the replication.
11. From the Replica Settings eld, type the maximum number of replications the schedule can initiate.
Edit a Replication Schedule
After creating a replication schedule, edit it to change how often the schedule initiates replications.
1. Click the Storage view.
2. In the Storage pane, select a PS Group.
3. Click the Storage tab.
4. From the Storage tab navigation pane, select a volume.
The volume must be the source of a replication relationship.
5. From the Schedules tab, select the replication schedule to edit.
6. Click Edit.
The Edit Schedule dialog box appears.
7. Modify the schedule settings as needed.
NOTE: For more information on the schedule settings, click Help.
8. Click OK.