Administrator Guide

Display the Backup Schedule Run Time Report
This section describes how to generate the Schedule Run Time report.
1. In the Server Connections area of the navigation pane, connect to a server or host.
2. In the Backup Extensions area of the navigation pane, select a data source.
3. In the Backup Sets area of the navigation pane, click Jobs . The Backup Jobs display
appears, showing all backup jobs for the server or host.
4. Click Schedule Run Time. The Backup Schedule Run Time Report dialog box appears.
Related links
Managing Existing Backup Sets
Managing Job Schedules
This section describes how to manage backup set schedules.
Related links
Managing Existing Backup Sets
Suspend a Schedule
Use the following procedure to pause a schedule. Restart the schedule at any time by using the Resume
Schedule option.
1. In the Server Connections area of the navigation pane, connect to a server or host.
2. In the Backup Extensions area of the navigation pane, select the data source.
3. In the Backup Sets area of the navigation pane, click Jobs . The Backup Jobs display
appears, showing all backup jobs for the server.
4. Select a backup job, and click Suspend Schedule. The schedule for the backup job is suspended.
Resume a Suspended Schedule
A resumed schedule will run at the next scheduled time for the backup set.
1. In the Server Connections area of the navigation pane, connect to a server or host.
2. In the Backup Extensions area of the navigation pane, select the data source.
3. In the Backup Sets area of the navigation pane, click Jobs . The Backup Jobs display
appears, showing all backup jobs for the server.
4. Select a suspended backup job, and click Resume Schedule. The schedule for the backup job is
resumed.
59