Deployment Guide

2. (Optional) Click Copy to clipboard to copy the fault domain information.
3. (Optional) Review the information on the Zoning, Hardware, and Cabling Diagram tabs.
NOTE: The ports must already be zoned.
4.
Click Next.
Configure iSCSI Ports
For a Storage Center with iSCSI front-end ports, verify iSCSI cabling and then enter network information for the fault domains and ports.
Prerequisites
One port from each controller within the same fault domain must be cabled.
Steps
1. Review the information on the iSCSI - Cable Ports page. If the Storage Center is not cabled correctly to create fault domains, fix the
cabling and click
Refresh
2. Click Next.
TheSet IPv4 Addresses for iSCSI Fault Domain 1 page opens.
3. Enter network information for the fault domain and its ports.
NOTE:
Make sure that all the IP addresses for iSCSI Fault Domain 1 are in the same subnet.
4. Click Next.
5. On the Set IPv4 Addresses for iSCSI Fault Domain 2 page, enter network information for the fault domain and its ports. Then click
Next.
NOTE:
Make sure that all the IP addresses for iSCSI Fault Domain 2 are in the same subnet.
6. Click Next.
7. Review the fault domain information.
8. (Optional) Click Copy to clipboard to copy the fault domain information.
9. (Optional) Review the information on the Hardware and Cabling Diagram tabs.
10. Click Next.
Configure SAS Ports
For a Storage Center with SAS front-end ports, the Review Fault Domains page displays information about the fault domains that were
created by the Storage Center.
Prerequisites
One port from each controller within the same fault domain must be cabled.
The ports for each fault domain must be cabled to the same server.
Steps
1. Review the information on the SAS - Cable Ports page. If the Storage Center is not cabled correctly to create fault domains, fix the
cabling and click Refresh.
2. Click Next.
The SAS – Review Fault Domains page opens.
3. Review the fault domains that have been created.
4. (Optional) Click Copy to clipboard to copy the fault domain information.
5. (Optional) Review the information on the Hardware and Cabling Diagram tabs.
6. Click Next.
68
Deploy the Storage Center