Users Guide

Now that the Wiring Closet is defined you will see a green WiringCloset icon on your floor plan. Double click that
icon to navigate into the wired closet.
1. Add a rack to the wired closet by selecting the Add Empty Rack icon and dragging it to the background.
2. To add a planned device, select the Add Planned Device icon to view the Manually Provision Rack Gear menu.
Select the device type in the Type menu, and then find the device you want to add. Drag it into the rack at the
appropriate location.
3. To add a wired device that is currently being monitored by AirWave, select Add Deployed Device.
4. Locate the device to be added.
5. Drag the device to the appropriate location in the rack, as shown in Figure 214.
Figure 214: Provisioning Devices
Wired devices that are added to a wired closet are included in any BOM report covering that floor.
Viewing Port Status on Deployed Switches
Deployed switches on a rack will display the port status as red (down) and green (up) interface icons, which
corresponds with the operationally up devices on the APs/Devices > Interfaces list. Planned switches do not display
these status indicators in VisualRF.
Dell PowerConnect W-AirWave 7.6 | User Guide Using VisualRF | 287