Instructions / Assembly

[2]
MODEL VFB25AC / VFB25AD/ VFB25ACH / VFB25ADH/ VFB25AEH / VFB25AX
INSTALLATIONS
A.Install with wood frame
Model No. VFB25AEH VFB25ADH VFB25ACH VFB25AD VFB25AC VFB25AX
Install Dim.
(inches)
9.98
9.68
9.98
9.68
9.98
9.68
9.98
9.68
9.98
9.68
9.98
9.68
1. Body installation
1-1. Construct the wood frame (not provided) with 30mm square bar and attach it to the
ceiling joist.
1-2. Attach the duct connector to the wood frame with taping screws.
1-3. Insert the body into the wood frame and connect it to the duct connector. Secure the
body on wood frame with taping screws.
1-4. Follow step 4 to 7 of installation to complete the installation work.
B. Install with joist
1. Choose the installation type according to the figure as below:
2. Type12 inches between joists
2-1. Insert the suspension bracket into the bracket cover of adaptor side and select one of
suspension bracket and of the back of the fan body.
2-2. Insert the fan between joists. Make sure the fan body is level and perpendicular with the
joist.
2-3. Ensure the distance between ceiling and fan body for the thickness of grille.
2-4. Secure the suspension bracket to joists by using screw.
2-5. Secure the suspension bracket to fan body by using screw.
2-6. Follow step 4 to 7 of installation to complete the installation work.
3. Type16, 19.2 and 24 inches between joists
Spacing A on Center
Joints
Insert Suspension Bracket
12 inches Refer to Fig. C-01, D-01, E-01
16, 19.2 and 24 inches Refer to Fig. C-02, D-02, E-02