Installation Guide

Connect valve body to water supplies using
the proper fittings for your valve body type
(copper tubing, iron pipe or Pex). Note: (1)
is the cold inlet port and (2) is the hot
inlet port.
If either of the two outlet ports is to be
unused, seal the port with a pipe plug.
Remove bonnet (1).
NOTICE: Avoid soldering at high
temperatures. Components of the rough
could become damaged.
Be sure stops (2) are removed from the
w/stops version before soldering. Do not
install stops before soldering.
If you are making a BACK TO BACK
OR REVERSE INSTALLATION (hot
on right and cold on left) install the valve
body as described, but the water supply
lines will be reversed. Note: (1) is the
hot inlet port and (2) is the cold inlet
port.
Copper Tubing Iron Pipe
Pex
C.
1
2
1
2
1
2
MultiChoice
®
Rough-In Installation
D.
1
2
472264 Rev. H