Installation Guide
4
P/N 27794 09/13
◘ Rough plumbing must be installed before panel
installation.
◘ Studs should be located as shown above.
◘ Install 2 horizontal 2 x 4’s between back wall studs as
shown.
◘ Secure 2 x 4’s to studs using 2-1/2” screws.
IMPORTANT! Ensure that the face of the horizontal 2 x 4
is ush with the surface of the vertical studs.
Install additional studs as shown for side panel support.
Stud length must be 70-3/4", located 1-1/2" above deck of
tub. See step 2.
◘ For masonry construction, floor and walls must be framed
to accommodate plumbing and installation.
ROUGHING-IN
Studs must be
plumb and square.
14-5/8"15-3/8"
14-5/8" 15-3/8"
12"
10"10"
33"
12"
60"
14-5/8"
14-5/8" 9-3/8"9-3/8"
9-1/4"
9-1/4"
12"
35"
12"
48"
11-1/2"
12-1/4"
12"
37"
12-1/4"
12"
10-5/16"10-5/16"
36"
36"x 36" 48" x 34"
60" x 32"
Horizontal 2" x 4" Horizontal 2" x 4"
Horizontal 2" x 4"
2" x 6" both sides 2" x 6" both sides
2" x 6" both sides
51-1/2"
(130,8 cm)
51-1/2"
(130,8 cm)
Horizontal
2" x 4"
50
(127 cm)
50
(127 cm)