Installation Guide

3
INSTALLATION
BEFORE YOU BEGIN BASE INSTALLATION
Mark unit position on floor and through drain
opening.
Mark the locations of the studs on the flange of the
base.
NOTE: These marks are used to verify base location
after drain is installed in Step 4 and outline where
adhesive is applied.
Position base in corner. Check for level left to right and
front to back.
IMPORTANT: If the subfloor is not flat and level, use
leveling compound or mortar bed to ensure that the
base is level (shown in Step 5).
NOTE: If using the matching wall set, install the base
against drywall or green board, not against the studs.
This is so that the wall set does not overhang the base.
Before base installation, check that the apron retainers are secure. The retainers should fit snuggly on the posts on the base and the
tabs should be inserted into the slots on the retainers. Adjust if necessary.
2
1
78326 Rev. C
Apron
Retainer
Tabs