Instructions / Assembly

3
INSTALLATION
BEFORE YOU BEGIN BASE INSTALLATION
Markunitpositiononfloorandthroughdrain
opening.
Markthelocationsofthestudsontheflangeofthe
base.
NOTE:Thesemarksareusedtoverifybaselocation
afterdrainisinstalledinStep4andoutlinewhere
adhesiveisapplied.
Positionbaseincorner.Checkforlevellefttorightand
fronttoback.
IMPORTANT: If the subfloor is not flat and level, use
leveling compound or mortar bed to ensure that the
base is level (shown in Step 5).
NOTE:Ifusingthematchingwallset,installthebase
againstdrywallorgreenboard,notagainstthestuds.This
issothatthewallsetdoesnotoverhangthebase.
Beforebaseinstallation,checkthattheapronretainersaresecure.Theretainersshouldfitsnugglyonthepostsonthebaseandthe
tabsshouldbeinsertedintotheslotsontheretainers.Adjustifnecessary.
2
1
78326Rev.B
Apron
Retainer
Tabs