Instructions / Assembly

5
If subfloor is flat and level,andmortarwasnotused,
applyadhesive
A
onfloorusing1/4"square-notched
trowel,stayingwithinpencilline(1).Proceedtostep7.
If subfloor is not flat and level,itisrecommendedto
putdownamortarbedwherethebasewillbepositioned.
Applyagenerousamountofmortar(1)thathasbeen
mixedtoathickconsistency.Usethemortartofillinlow
areas.Placethebaseinthewetmortar,adjustuntilitis
level,andletmortarcurefor24hours.Proceedtostep7.
Itisrecommendednottostandinbasewhilesecuring
towall.Setbaseincornerandpressitintoadhesive.
Drillpilotholesthroughflangesintostudsusinga3/16"
drillbit.Securebaseflangestowallstudswith1-1/2"
panheadorroundheadscrews(notprovided).
IMPORTANT: Be careful not to contact base with
drill chuck while drilling pilot holes.
IMPORTANT: Gaps between flanges and studs
must be less than 1/8". Insert shims to fill gaps if
needed.
Finishinstallingdrainpermanufacturer'sinstructions.Fillinanygapsbetweentheapronandsubfloor
withconstructionadhesiveandshims.Followthe
manufacturersrecommendationforadhesivecuretime.
Trimshimsafterglueisdry.
1
2
3
9
7
Shim
78326Rev.B
6
B.
A.
A
1
A.
B.
1
FlatandLevelFloor
UnevenFloor
2