Installation Guide

Health and Safety
Required safety equipment: hard hat, safety boots, gloves, safety glasses.
Always follow all safety precautions as directed by the Occupational Safety and Health
Administration (OSHA-USA) or the Construction Safety Association (Canada).
Please refer to Safety Data Sheets for all components and observe all recommended
safety precautions therein.
The general codes of practice for protection at work and instructions of the manufacturers for
tools and components are to be observed at all times.
Recommended Materials
DELTA®-FL
DELTA®-MOISTUREPROOF TAPE
Low expansion spray foam
Self-leveling compound (if required)
Other materials depending on final floor material:
4’x 8’ plywood or OSB (minimum 7/16” thick)
1/4” x 1 1/2” Tapcon® fasteners (Phillips head)
Silicone sealant (recommended)
Needle-punched geotextile (landscaping fabric)
Recommended Tools
Broom and/or vacuum cleaner
Measuring tape
Utility knife or scissors
Straight edge and/or carpenter’s square
Circular saw and/or jigsaw
Hammer drill
Caulking gun
Phillips screw driving bit
Preparing the Concrete for Installation
The concrete floor and foundation walls should be dry, free of large cracks, excessive
moisture, leaks and flooding. DELTA®-FL is not meant to replace good foundation design or
maintenance.
Any pre-existing unsound or moisture-sensitive flooring materials should be removed prior to
installation of DELTA®-FL.
The floor should be as level as possible. Remove any bumps or ridges. In areas with
depressions greater than ¼”, self-leveling compound should be used.
Thoroughly clean and vacuum the concrete floor.
Ensure floor area is solid and free of mold and fungi.
Optional: In case of uneven floors, installing a layer of needle-punched geotextile
(landscaping fabric) underneath the DELTA®-FL can reduce the potential for clicking noises.
Installation
Beginning at the longest straight wall, roll out the DELTA®-FL, dimple side down and
cup side up.
DELTA®-FL should be installed as tightly as possible to all walls (see Detail 1).
For applications with stud walls already in place, lift the protective moisture barrier at the
bottom and place over top of DELTA®-FL (see Detail 2a).
For applications with stud walls already in place that do not have a protective moisture
barrier underneath or applications directly against the foundation wall, seal the gap between
DELTA®-FL and bottom plate or wall with low expansion spray foam (see Detail 2b).
For applications without stud walls already in place, non-load bearing stud walls may be
constructed on top of DELTA®-FL. Load-bearing walls should not be placed on
top of DELTA®-FL.
End laps and side laps shall be placed tightly to the adjacent roll of DELTA®-FL. Do not overlap
or interlock the dimples. Seal all end laps and side laps with DELTA®-MOISTUREPROOF TAPE
(see Detail 3).
HIGH PERFORMANCE AIR & MOISTURE BARRIERS
DELTA
®
-FL
Keeping Floors Warm & Dry Installation Instructions.