STEP 1. ROUGH IN
STEP 2. FAUCET INSTALLATION
Mount faucet to sink using the provided components in the following
order - grey bottom spacer, washer, lock nut (Fig. 36). NOTE: The
black top spacer must be used at all times between the spout
and countertop/sink, and the grey spacer must be used at all
times between the washer and deck. Ensure open side of bottom
spacer faces up. Washer faces away from sink and must not
touch any conductive surfaces (metal sink, screws, drainage).
If cover plate is being used, it must be between the top spacer and
the deck. Ensure that gasket is sitting inside groove of top spacer.
Use the same procedure for installation of optional 4” or 8” deck
plate package (061159A or 061160A). Mount the faucet to the sink using nut(s) and washer(s)
provided. Do not overtighten the nut or reposition the faucet once installed, otherwise damage
to the gasket may result. Cutting or trimming of the gasket is not recommended. NOTE: If the
gasket is trimmed or not installed, then use clear silicone sealant between the faucet and
lavatory to prevent water from leaking beneath lavatory.
Note: Wires connecting between box(es) and from transformer
must be protected from abrasion and being pulled at connections.
They also may have to be routed through at a later stage of
construction. Depending on installation, the cable bushings included
may be replaced by installer supplied 1/2” conduit. Rough-in box
as per Figure 34.
The transformer is to be installed in an adjacent accessible space.
(Do NOT install the transformer inside the control box.) Cable
from the transformer to the driver board/controller may be roughed
in at this time depending on installation. Use cable which complies
to local electrical codes for a 1 amp load. No.18 is usually sufficient.
If recessed box is supplied, rough in as per Figure 35. The most
vandal resistant installation is when the control box is as close to
the bottom of the sink as feasible. For wall hung sink installation,
sensor conduit rough in should be directly under the basin to
minimize sensor cord exposure. Rough in drainage. Rough in
water supply to 10” control box inlets and to spout connection.
Finish walls.
Valve spacer is for temporary use only for flushing of system. Must
be replaced with solenoid and washers (Figure 35).
STEP 4. FLUSH SYSTEM/SET TEMPERATURE
Remove coverplate from control box. Open screwdriver stop(s) to flush installation for one
minute minimum.
4A
Run water for a sufficient time so the hot and cold water supplies are as hot and cold as
possible.
4B
Place a thermometer in a plastic container and hold in the water stream. Record the
temperature reading and note position of temperature control, and lock at desired setting.
4C
Thermostatic Mixing Valve (Fig. 37) To adjust the mixed outlet temperature of the valve,
remove the cap to gain access to the adjusting spindle. The spindle should be rotated
towards the “C” side to reduce the temperature and towards the “H” side to increase the
temperature - until the desired set point is reached.
Periodic Inspection/Maintenance - It is recommended that this valve is checked at least
once per year to ensure its continued function. For installations with poor or unknown water
quality, or other adverse supply conditions, it may be necessary to check the valve at more
frequent intervals. The temperature should be checked at the same outlet as was used for
commissioning in the first instance. If the temperature is more than 3°F from the commiss-
ioning in temperature, refer to the included Cash Acme Maintenance and Installation
Guide.
4D
Close stop(s).
STEP 3. CONNECT WATER SUPPLY
Install sink and connect drainage to rough in. See Figure 35. Polymer braided hose (supplied)
must be connected to the spout. Other connection tubes and fittings are supplied by the
installer to connect to the 1/2” nominal sweat at the box outlet. Connect water supply through
to spout. Assure supply lines are completely flushed and free of debris. Install aerator.
Fig. 34
590TPxxx8TR Hard Wire Operated Control Box #8 Trim
INSTALLATION AND SET UP INSTRUCTIONS
Control Box #8
Fig. 35
1/2” Sweat
Outlet
Flexible Sensor Cord
Conduit (supplied on
Recessed Mount Box)
Cold Inlet
1/2” Sweat
Hot Inlet
1/2” Sweat
061252A
Driver
board
to be
located
on this
bracket
063135A
Stop
063135A
Stop
063179A
Thermostatic Mixing Valve
with checks & gaskets
Grounding cable with copper
clip should be secured directly
to the sink if possible (if sink
is conductive). The clip and
cable should be located and
routed such that accidental
disconnection is unikely.
Product supplied
as shown by solid
lines. All items
shown by dotted
lines supplied by
others.
Typical Installation
(Recessed Mount Box)
Flexible
Sensor
Cord Conduit
Polymer
Braided Hose
257mm (10.13")
Control Box
305mm (12")
Stainless Steel
Cover Plate
102mm (4")
355mm