Installation Guide

3
INSTALLATION
ROUGHING-IN
Studs must be plumb and square.
2
1
92458 Rev. A
38-1/2"
13"
13"
38-1/2"
Position base in corner. Check for level left to right and
front to back.
IMPORTANT: If the subfloor is not flat and level, use
leveling compound or mortar bed to ensure that the
base is level (shown in Step 5).
Mark unit position on floor and through drain opening.
Mark the locations of the studs on the flange of the
base.
NOTE: These marks are used to verify base location
after drain is installed in Step 4 and outline where
ashesive is applied.