DIRECT-TO-STUD BATHTUB WALL SET 93504 CONJUNTO DE PARED DE TINA DIRECTA AL MONTANTE ENSEMBLE MURAL POUR BAIGNOIRE FIXÉE AUX MONTANTS Model / Modelo / Modéle B66414-6032-WH Retain these instructions for future use. Conserve estas instrucciones para usarlas en el futuro. Conservez ces instructions pour consultation. RP94116 Wall Tape Cinta de pared Ruban adhésif www.deltafaucet.com 1 08/30/2017 93504 Rev.
! REQUIREMENTS FOR SUCCESSFUL INSTALLATION KNOWLEDGE BASE: Framing Plumbing Tiling These instructions include suggestions for rough construction and plumbing installation. Local building codes vary and could supersede those suggestions. If you are not confident in your ability to perform these tasks, contract out those tasks you need help with or use a professional installer. DO NOT use drywall screws to secure flanges to wall studs. Product damage will occur and will void the warranty.
TOOLS AND MATERIALS REQUIRED • 2 x 4 Lumber for additional wall studs • (8) 1 x 3 x 8' Lumber NOTE: It is recommended to install insulation. HERRAMIENTAS Y MATERIALES NECESARIOS • Tablas de madera de 2 x 4 para montantes adicionales en las paredes • Tablas de madera de 1 x 3 x 8' (8) NOTA: Se recomienda instalar el aislamiento.
ROUGHING-IN Rough plumbing and bathtub must be installed before panel installation. For masonry construction, floor and walls must be framed to accommodate plumbing and installation. Studs should be located as shown below. CONEXIÓN DE CAÑERÍAS Deben instalarse las cañerías y la bañera antes de instalar el panel. Para los trabajos de mampostería, el piso y las paredes deben acanalarse para dar lugar a las cañerías y la instalación. Los entramados deben estar ubicados como se muestra a continuación.
1 2 A. A. x x y y A. Dry Fit Walls A. Place drop cloth in bathtub to protect surface while installing walls. Prepare for Plumbing Fixtures Measure and mark location for plumbing fixtures. Place the back wall and side walls into the pocket. Using proper size hole saw, cut out plumbing fixture holes. Check alignment of walls and gaps at seams. Large uneven gaps are a sign of out-of-plumb walls or an un-level tub or base. Check if the tub is level.
2 3 B. 57" (144.78 cm) Back side of panel. Parte posterior del panel Face arrière du panneau. 1.5" (3.81 cm) 46" (116.84 cm) 12" (30.48 cm) 12" (30.48 cm) 1 2 B. Apply Fire Retardant Pad Install Back Wood Supports Remove backing from self-adhesive pad (1). Install horizontal, 57” long 1x3’s on back stud wall as shown. Use 1-1/4" screws to attach to studs. Install sistered studs if needed. Center pad over mixing valve hole (2) and press firmly onto back side of panel.
4 5 A. 1 2 Prepare Back Panel A. Position back panel as shown, leaving an even gap on both sides of back panel. Apply double sided tape and polymer sealant/adhesive as shown. Sealant beads should be 3/16” to 1/4” thick. Tape pieces should be approximately 2” long. Drill 3/16" holes at all stud locations on top flange (1) and screw groove (2). ! Drill 3/16" clearance holes into flanges only. Do not drill 3/16" holes directly into studs. Drill chuck can damage panel.
5 6 B. 28 3/4" (73.03 cm) 1 3 46" (116.84 cm) 2 3/4" (1.91 cm) 1 12" (30.48 cm) 12" (30.48 cm) B. Install Back Panel Install Side Wood Supports Press back panel in place. Install horizontal, 28 3/4” long 1x3’s on side stud walls as shown. Use 1-1/4" screws to attach to studs. Holes may need to be cut in boards to accommondate plumbing. Secure top flanges (1) and screw groove (2) to studs with 1-1/4" panhead or roundhead screws. Do not overtighten screws, this can cause panel to crack.
7 8 A. 1 2 3 Prepare Side Panels A. Work with one panel at a time. Drill 3/16" holes at all stud locations on top flanges (1) and screw groove (2). Working with one side at a time, apply double sided tape and polymer sealant/adhesive as shown. Drill 3/16" holes along side flanges (3) at five locations equal distance apart. ! Sealant beads should be 3/16” to 1/4” thick. Tape pieces should be approximately 2” long. Drill 3/16" clearance holes into flanges only.
9 8 B. 1 4 2 2 3 1 B. Install Side Panels Brace Wall Panels Slide the side panel into gap between wall and back panel, pressing firmly into corner and against studs. Install temporary braces (1) to hold back panel tight against studs while polymer sealant cures. Protect surface of wall and tub (2) where it will contact braces. Secure top (1), screw groove (2), and side flanges (3) to studs with 1-1/4" panhead or roundhead screws. Do not overtighten screws, this can cause panel to crack.
10 B. A. A. Prepare for Tile B. Using a 3/16" V-notch trowel, spread out the sealant. Plan your tile layout so that cut tiles are even at the ends of the tile inlay on the back wall. Start the front of the side wall inlay with full tiles. If using tile smaller than 1" wide, be careful not to press the tile down into the screw groove. (Detail view) Use painter’s tape and a drop cloth to protect the walls and tub during tile installation and grouting.
11 Apply Polymer Sealant Apply polymer sealant to all seams. NOTE: Silicone or acrylic latex sealant is not recommended. Use an advanced kitchen and bath polymer sealant for best results. For further inquiries and a list of recommended sealants, contact customer service at consumercare@ deltafaucet.com, or 1-800-355-2721. ! IMPORTANT: Allow 24 hours before exposing to water. Install plumbing fixtures and fittings per manufacturer’s instructions. Check for leaks at all connections before use.
CARE AND CLEANING We recommend that you clean your acrylic bathing product with mild detergents. Use a terry cloth towel, soft cloth, or sponge. Avoid using abrasive scrubbing pads, steel wool, or sponges. After cleaning, rinse thoroughly with water. NOTICE: When using drain cleaner or clog remover, rinse thoroughly with water. NOTICE: Certain chemicals and cleaners may deteriorate the acrylic surface, causing cracks and, potentially, property damage.
LIMITED WARRANTY All All parts and finishes of the Delta® Tub Shower unit are warranted to the original consumer purchaser to be free from defects in material and workmanship for the time periods listed below. Delta recommends using a professional plumber for all installation and repair.
NOTES / NOTAS 15 93504 Rev.
93504 Rev.