Installation Sheet

Installation
1
Cartridge Installation
A. B.
Turn off water supplies.
 Remove cover (1), 
bonnet nut (2) and test cap (3) from the body. 
Place a bucket or small container over the front 
of the valve body and slowly open the water 
supplies to ush any debris from the supply 
lines before installing the cartridge. Turn the 
water suplies back off. If this is not a thin wall 
mounting, the entire plasterguard (4) may be 
removed. If screen (5) is in place, remove 
before installing cartridge.
Rotate the cartridge (1) so the word “UP” (2) 
appears on the top. The “H” must be on the 
hot side and the “C” must be on the cold side. 
Add silicone lube to the three o-rings (3) shown 
above to make the cartridge easier to install and 
remove from the valve body. Insert cartridge 
into valve body as shown. Ensure the keys on 
the body are fully engaged with the slots in the 
body (4).
Slide bonnet nut (1) over the cartridge and 
thread onto the body. Hand tighten securely.
For the exceptions of back to back or reverse 
installations (hot on right and cold on left) only: 
Rotate cartridge (1) so “H” is on the hot side 
and “C” is on the cold side and the word “UP” 
(2) appears on the bottom. Add silicone lube 
to the three o-rings shown above to make the 
cartridge easier to install and remove from the 
valve body. Install the cartridge making sure 
that the keys are fully engaged with the slot in 
the brass body (see step B). Slide bonnet nut 
(3) over the cartridge and thread onto the body. 
Hand tighten securely.
3
C.
Back to back Installation
Clod
Hot
Normal Installation
(changes not required)
Reverse
Installation
1
2
3
5
4
2
3
1
4
4
2
3
1
1
68883 Rev. I










