Installation Sheet

Installation
2
Showerhead and Tub Spout Installation
5
Copper Sweat Installation
Remove O-ring (1) from adapter (2). Solder 
adapter to tube taking care to keep solder away 
from O-ring groove. CAUTION: NO SOLDER 
PERMITTED ON OUTSIDE DIAMETER OF 
ADAPTER ADJACENT TO O-RING GROOVE. Cut 
off tube (3) and replace O-ring on groove of brass 
adapter. Thread tub/spout onto adapter, taking 
care not to damage O-ring, and hand tighten until 
spout is rmly against nished wall and all slack is 
taken up behind wall.
B-4
1
3 2
Iron Pipe Installation
Installation of easy-on universal tub spout
Install pipe nipple so that end of nipple projects out 
from nished wall surface 1/2" to 1 1/4" (13 mm to 
32 mm).
Apply plumber tape or pipe dope to pipe threads. 
Hand tighten adapter (1) onto pipe nipple (2). 
Finish tightening with standard pipe wrench until 
a positive seal is implemented. Take care not 
to damage O-Ring (3) groove. Back of adapter 
(1) must not project more than 1" (25 mm) from 
nished wall surface.
Hand tighten tub spout onto adapter (1) taking care 
not to damage the O-Ring (3).
B-3
1/2" to 1 1/4" 
(13 mm to 32 mm)
1 2
3
68883 Rev. I










