ELEVATOR MODERNIZA TION CONTRACT/SPECIFICA nONS FOR: Governor's Park Condominium 777 Washington Street Denver, Colorado TABLE OF CONTENTS 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 1.13 1.14 1.15 1.16 1.17 1.18 1.19 1.20 1.21 1.22 1.23 1.24 1.25 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.10 2.11 2.12 2.13 2.14 2.15 2.16 2.17 2.18 3.01 4.01 5.01 6.01 7.
Governor's Park Condominium 8.01 SCHEDULE OF APPROVED COMPONENTS Elevator Consulting and Design, Inc.
Governor's Park Condominium 777 Washington Street Denver. CO ELEVATOR MODERNIZATION/CONTRACT/SPECIFICATION . 1.01 SCOPE OF WOR/( A. Furnish all engineering, materials, labor, tools, equipment, transportation, supervision, testing and inspections to modernize two (2) traction passenger elevators as specified herein. In addition, perform full coverage preventive maintenance service commencing upon Notice to Proceed and continuing through the warranty/guarantee period. B.
777 Washington Street Denver, CO Govcrnor·s .Park Condominium 1.05 PERMITS AND INSPECTIONS A. The Elevator Contractor shall give all requisite notices, obtain and pay for all permits, and pay all deposits and fees necessary for the installation of all work provided under this Contract/Specification. In addition, the Elevator Contractor shall obtain and pay for all necessary state and local inspections and conduct such tests as may be required by the regulations of such authorities.
777 Washington Street Denver, CO Governor's Park Condominium 1.08 1. One (1) set of diagnostic tools, including all manuals, codes and sundries necessary to operate the tools to test, adjust and maintain the elevator equipment provided. The tool shall become the property of the owner. 2. Three (3) sets of complete certified engineering data, including parts lists and parts numbers on all equipment as will be necessary for maintaining the equipment and for ordering replacements.
777 Washington Street Denver, CO Governor's Park Condominium B. The equipment shall be installed in accordance with the equipment manufacturer's direction, referenced codes and Contract/Specifications. C. The machine room equipment shall be installed with clearances complying with referenced and applicable codes and Contract/Specifications. D.
GovemOl·ts Park Condominium 777 Washington Street Denver, CO $2,000,000 Umbrella Liability Coverage D. The Elevator Contractor shall provide immediate notice and provide copies of all reports of any accidents of any kind to the Owner. Additional insurance as required by Insignia, of which a copy is attached in the sample contract. 1.12 SPECIAL TOOLS AND INSTRUCTIONS FOR USE A.
Governor's Park Condominium 777 Washington Street Denver, CO 1. Relocate the existing main line disconnects so as to be accessible upon entering the elevator machine room. Install new copper wiring and "Ground" from the new disconnect panels to each Elevator Control Panel. Elevator Contractor shall be responsible for designing new elevator equipment to work with existing electrical feeders. 2. Furnish and install new separate 110 volt lockable disconnects for cab lighting.
Governor's Park Condominium 777 Washington Street Denver, CO tractor. All work shall be made absolutely stable and secure and the Elevator Contractor shall be held strictly responsible for any damage resulting from failure to properly furnish such support. D.
Governor'sPark Condominium 777 Washington Street Denver, CO 2. Be sensitive to the needs and entitlements of the occupants of the building while performing the work 3. Confirm that the Contract/Specification and contract documents are complete with regard to the work required to provide for a complete, legal and Code compliant installation. 4. Confirm that the elevator equipment to be provided will fit within the space available.
Goverl.lor'sPark Condominium 777 Washington Street Dcnver~ CO B. The Elevator Contractor shall provide all labor, tools and equipment necessary for on-site observations, testing, retesting, inspections and re-inspections as may be required to satisfy the Code testing requirements, the requirements of the local testing authority and the requirements of the Owner. C.
Governor's Park Condominium 777 Washington Street Denver, CO Elevator Contractor go beyond the contract schedule, the Elevator Contractor will continue to provide full maintenance coverage at no cost to owner. B. Warranty Maintenance: Once the elevator modernization work has been completed and accepted as substantially complete by the Owner and Elevator Consultant the Elevator Contactor shall provide warranty maintenance for 12 months.
777 Washington Street Denver, CO Governor'sPark Condominium 1.25 CONTINUING SUPPORT A.
Governor's Park Condominium 2.01 777 Washington Street Denver, CO ELEVATOR SCHEDULE/EQUIPMENT SUMMAR Y (1) Quantity Speed Capacity Sto s Openings Travel: Machine Hoist Motor Hoist Ro es Rope Gripper Controller Power Conversion Governors Deflector Sheave Hoistway door equipment 300 FPM 2,000Ibs. 14 14 in line 300 FPM 2,000Ibs. 14 14 in line Contractor to verifY 2 Car HW Geared DC Motor Replace drive sheave, gaskets, and oil seals.
Governor's Park Condominium 777 Washington Street Denver, CO 2.02 CONTROL SYSTEM VWF DRIVE A. The existing US Elevator control system shall be removed and a new microprocessor control with 2-car group shall be furnished and installed. Remove the Motor Generator Sets and install new Variable Voltage Variable Frequency Drives. (VVVF Drives) B. A position selector shall provide positive means of determining the position of the elevator in the hoistway at all times.
Governor's Park Condominium 777 Washington Street Denver, CO H. Switches shall be of the direct current type, magnet operated with contacts of design and material to insure maximum conductivity, long life and reliable operation without overheating or excessive wear, and provide a wiping action to prevent sticking due to fusion. Switches carrying highly inductive currents shall be provided with arc deflectors or suppressers. 1.
Governor's Park Condominium 777 \Vashington Street Denver, CO without jars or bumps. Stopping upon operation of emergency stop switch shall be rapid but not violent. a. Vertical Acceleration: Maximum 4 ft. (1220 mm) per second squared. Maximum jerk 8 ft. (2440 mm) per second cubed. b. Horizontal Acceleration: Maximum 10 mg peak-to-peak measured at full speed for full travel in both directions. 2. Full Speed Riding: Free from vibration and sway. 3.
Governor's Park ConoOJIliniuffi 777 Washington Street Denver, CO that call shall be canceled. The call shall remain canceled and the hall button ineffective until the car doors begin to close after passenger traffic. Calls registered on car buttons shall cancel in the same manner. D. The supervisory control system shall operate to meet the changing traffic conditions on the basis of demand. Provisions shall be included for handling traffic as follows: 1.
Governor's Park Condominium 777 Washington Street Denver, CO 6. Coincident Calls: The control shall give priority in assignment of a hall call to a car with a corresponding car call. If this coincident hall call cannot be answered within the adjustable priority time, the car with the best potential arrival time shall be assigned to the hall call. 7. High Priority Floor: A priority floor shall be a floor which is to be served within a preset adjustable time.
Governor's Park Condominium 777 Washington Street Denver, CO 2.04 CONTROLLER DIAGNOSTICS A. The controller shall be non-proprietary and include the ability to perform diagnostic analysis of the system capable of determining faults. When a fault occurs, the computer shall be able to provide a retrievable fault code message identifying the location of the elevator, the time of day of the occurrence, and the number of times the fault has occurred.
(;ovcrnor'sPark Condominium 777 Washington Street Denver, CO shall be of the same characteristics as the normal power and shall have the same phase rotation. B.
Governor's Park Condominium 777 Washington Street HmIn.T, CO cation of when the car passes or stops at a floor. Provide a voice announcement system and floor passing chime. 2.11 DRIVE ivIACHINES AND GOVERNOR A Retain the existing Hollister-Whitney geared hoist machines. Replace the existing Hoist Machine Drive Sheave on each elevator. Replace all seals and gaskets in order to eliminate excessive oil leaks. Adjust and/or replace the "thrust bearings" in order to eliminate excessive "backlash" and noise.
777 Washington Street Denver, CO Governor's Park Condominium structions for phase II shall be engraved. A fire service indicator light and fire phone jack (provide stainless steel blank for future use) shall be provided. Furnish and install a new "hands free" Communications Device in accordance with ADA requirements. c. A two-way communications device (intercom) shall be provided in each elevator cab, and motor room.
777 Washington Street Denver, CO GovcmortsPark Condominium K. Install Key Operated Hoistway Access Switches at the Top and Bottom landings. Provide a key-operated Hoistway access device and car top operating device. Key switches shall be mounted in or adjacent to the door frames with only the ferrule exposed at terminal landings. Means for limiting the travel of the elevator from the Hoistway Access Switch shall be provided in accordance with the AI7.I 2007 Code requirements. 2.
777 Washington Street Denver, CO Governor's Park Condominium B. The existing car safeties shall be retained, cleaned and adjusted to ensure proper operation. C. Provide "Car Top Railing" per code. 2.16 HOISTWAY EQUIPMENT A. The existing roller guide assemblies for the car and counterweight shall be retained. Replace worn/defective roller guides. B. Each elevator shall be suitably counterbalanced for smooth and economical operation.
777 'Washington Street Denver, CO Governor'sPark Condominium F. Existing dust cover plates shall be retained. They shall be arranged to assure hanger accessibility from within the car. G. Furnish and install new door gibs. One at the leading edge and one at the trailing edge of each door panel. H. Retain floor designations with Braille at each hoistway entrance on both sides of the jamb. I. Provide floor numbers, not less than 4" in height on the hoistway side of the hoistway doors at intervals per code.
777 Washington Street Denver, CO Governor's Park Condominium 2. Flight Time: Start to measure this time when the fully opened doors begin to close and continue to measure the time until the car is stopped level with the next floor and the car and hall doors are open to % of their fully open position for center opening doors or Yz open for side opening doors. 3. A typical floor shall be 12'-0". 4. Floor level is considered to be within 1/8 inch oflevel. 5.
Governor's .Park Condominium 777 Washington Street Denver, CO 3. Car & Hall Door Dwell Time: 3 seconds after stopping for a car call. Timer to be adjustable from 1 to 8 seconds, 5 seconds after stopping for a hall call. Adjust the hall call time as per ADA formula requirements. 4. Reduced Short Door Time: Initially adjusted to 1 second after interruption of the electric edge to be adjustable from 0 to 10 seconds. 5. Lobby Door Time: Initially set per ADA code requirements.
Governor's .Park Condominium 777 Washington Street Denver, CO b. Ensure smooth quite operation in full travel, floor-to-floor runs and door operation. 4.01 WIRING A. All wiring shall be new to ensure proper operation as set forth in this Contract/Specification. Some hoistway duct may be reused upon prior Consultant's approval. B.
Govcrllor'sPark Condominium I. 777 Washington Street Denver, CO Liquidated Damages: 1. For each day the Elevator Contractor is late during phase I of the project the contract price shall be reduced by $100.00 per day. 2. For each day the Elevator Contractor is late during phase II of the project the contract price shall be reduced by $400 per day. 6.01 TESTS A. Perform Phase I and Phase II Fire Service tests to conform to ANSI A17.1 2007, Part 2. Section 2.27 B.