2.01 ELEVATOR SCHEDULE/EQUIPMENTSUMMARY (1)
Quantity
Speed
300 FPM 300
FPM
Capacity 2,000Ibs. 2,000Ibs.
Sto s
14
14
Openings
14
in line
14
in line
Travel:
Contractor
to
verifY
2 Car
Machine
HW
Geared Replace drive sheave, gaskets, and oil seals.
Hoist Motor DC Motor Provide new "low sli "
AC
Hoist Motor
Hoist
Ro
es Install new Hoist
Ro
es
Hoistway door equipment GAL
Rope Gripper
Controller
Power Conversion
Governors
Deflector Sheave
Hoistway limit switches
Car
& Cwt Rails
Wiring/Duct
Cwt roller ides
Car-to -control
Car roller guides
Door
0 erator
Car Door Equipment
None
Relay Logic
MGSet
Provide new in accordance with A17.1 2007
Provide new micro rocessor controllers. (A17.l 2007)
New Variable Voltage Variable Fre uency Drive
Overhaul as needed and retain existin Governor
Clean, lubricate, re lace worn bearin and retain.
Provide
all
new.
Retain existing roller guides.
Re
lace worn rollers.
Provide new closed
100
door 0 erators. GAL MOVFR
Provide new tracks, hanger rollers, headers, and clutch. Retain the
existing Car Door Panel.
Provide er current code
Provide new Janus Panachrome 3D or a roved e ual.
Install new laminated plastic front return panel, car door panel,
four (4) side panels
(2
per side) and three (3) rear panels, stainless
steel reveals, handrail, flooring, and new dro ceiling anels.
Cab Enclosure
Hall
PB
Station Provide
all
new fixtures w/ digital
PI
at each floor.
Car
0 eratin Panel Provide new Main COP. A17.l 2007 com liant
w/
di
ital
PI.
Car Traveling Lantern Provide new Car lanterns. Chimes and LED's
Main Floor Hall Lantern Provide new Combination lanterns and digital PI's
Hoistwa Access
Sws.
None Provide To and Bottom Hoistwa Access er code
Fire Command Center Provide
all
new digital PI's and key switches (FS, EP)
(1)
SUlIl1IlalJ'
is
just
a
brief
outline to gil'e general scope
of
work.
If
a discrepallcy exists between the
summalY
and
body
of
the technical specifications, or
if
all item is not included in the summary, the body