Specifications

Govcrnor·s .Park Condominium
777 Washington Street
Denver,
CO
1.05
PERMITS
AND
INSPECTIONS
A.
The Elevator Contractor shall give all requisite notices, obtain and pay for all permits, and pay
all deposits and fees necessary for the installation
of
all work provided under this Con-
tract/Specification. In addition, the Elevator Contractor shall obtain and pay for all necessary
state and local inspections and conduct such tests as may be required by the regulations
of
such
authorities. These tests shall be made in the presence
of
the authorized representative
of
such
authorities and in the presence
of
the Owner.
An
elevator installation permit shall be displayed
on the job site and visible to interested parties.
B.
The installation, when complete, shall receive the final approval
of
all constituted authorities
and the Elevator Contractor shall submit evidence
of
the inspection results and the Certificate
of
Operation from the constituted authority.
1.06
A.
ELEVATOR
CONTRACTOR QUALIFICATION
The Elevator Contractor shall be one regularly engaged in the business
of
design, engineering,
manufacture, installation, modernization, and!or servicing
of
elevators
of
the type and character
required by this Contract/Specification, shall be or represent an approved manufacturer, and
shall assume full responsibility for the products used in assembling the elevator equipment.
Certified engineering drawings and descriptive technical data on the proposed equipment shall
be provided by the Elevator Contractor as furnished
by
the component manufacturer.
B.
The Elevator Contractor shall show successful experience in the complete installation, mod-
ernization, and maintenance
of
elevators, that it employs competent personnel trained in the in-
stallation, modernization, and maintenance
of
the equipment required in this Con-
tract/Specification, that it maintains locally an adequate stock
of
parts for replacement or emer-
gency, and that it has qualified employees locally available to ensure the fulfillment
of
the ser-
vice without unreasonable delay. This maintenance service shall be performed solely by the
Elevator Contractor and shall not be assigned or transferred to any agent or subcontractor.
1.07
SHOP
DRAWINGS/SUBMITTALS/AS
BUILT
DRAWINGS
A.
Job specific shop drawings and technical coordination information shall be submitted for re-
view prior to commencing with fabrication
of
the equipment. The first shop drawing submittal
shall
be
complete. Partial shop drawings will not be reviewed until they are complete. Delay in
the project as a result
of
partial submittals shall be the responsibility
of
the Elevator Contractor.
Shop drawing submission shall include, but not be limited to, the following:
1.
Hoistway and Machine Room Layouts.
2.
Signal Operating Fixture Details.
3.
Electrical coordination information.
4.
Structural calculations for the new machine as required by code.
B. Upon completion
of
the project, the Elevator Contractor shall submit the following:
Elevator
Consulting
and
Design,
Inc.
2