Instructions / Assembly

Wave 7 Rack
In-Ground Installation
1. Place corrosion resistant sleeve (min. 3”
inside diameter) in sand pour bed in exact
location where rack will be installed. Make
sure top of sleeve is at same level as desired
nished concrete surface. Fill sleeve with sand
to keep it in place and prevent it from lling
with concrete.
2. Pour concrete and allow to cure
3. After appropriate cure time, dig out sand
from sleeves and insert racks, making sure
they are level and at the appropriate height.
Pour in Por-Rok or epoxy grout and allow to
set.
Final grade level
Sand pour bed
Poured concrete (4-7”)
Installing into existing concrete
Core holes no less than 3” diameter (4” recommended) and 10” deep into sidewalk. Fill holes with
Por-Rok or epoxy grout. Place rack into holes, making sure the rack is level. 33”-36” of the rack should
remain above the surface. If the rack is less than 33” high, it will not support the bike adequately. Make
sure the rack is level and held in place until the grout has set.
Tools Needed
Level
Cement mixing tub
Shovel
Trowel
Hole coring machine with 4” bit
Access to water hose
Installing into new concrete