Instructions / Assembly

www.dero.com | 1-888-337-6729
Place corrosion resistant sleeve (min. 4” inside
diameter) in sand pour bed in exact location
where rack will be installed. Make sure top
of sleeve is at same level as desired finished
concrete surface. Fill sleeve with sand to keep it
in place and prevent it from filling with concrete.
Pour concrete and allow to cure.
1 2
Hole coring machine with 4” bit
Access to water hose
Materials to build brace (see “Install Tip” at bottom of page)
TOOLS NEEDED
Level
Cement mixing tub
Shovel
Trowel
INSTALLING INTO A NEW SIDEWALK
Final grade level
Sand pour bed
Poured concrete (4-7”
deep)
© 2015 Dero
INSTALLING INTO EXISTING SIDEWALK
Core holes no less than 3” diameter (4”
recommended) and 10” deep into sidewalk. Fill
holes with Por-Rok or epoxy grout. Place Swerve
Rack into holes, making sure the rack is level. 33”-
36” of the Swerve Rack should remain above the
surface. If the Swerve Rack is less than 33” high, it
will not support the bike adequately. Make sure the
rack is level and held in place until the grout has set.
33-36”
SWERVE RACK
Installation Instructions – In Ground Mount
Core ” diameter
holes ” deep