INSTALLATION
3-6 15 Nov 09
Figure 3-4 Electrical Connections
SPLASH PLATE ADJUSTMENT
The splash plate is adjustable in 1/4” increments within a range of 1/4” to 1-1/2”. Generally, the
gap should be set to accommodate the gas content of the drilling fluid. If gas content is high, it
may be desirable to maximize release of gas by narrowing the splash plate gap. However, at the
smallest opening, flow through the degasser will be approximately 500GPM; at its largest gap,
flow is about 1500GPM. The setting should be consistent with process considerations and based
on experience in operating the degasser.
To adjust the splash plate gap (Figure 3-5), proceed as follows:
1. Loosen bolts on both ends of the splash plate sufficiently to permit disengagement of the
splash plate and guide teeth.
2. Move splash plate upward to increase the gap or down to reduce the gap, being certain that
plate is parallel with top of riser.
3. When desired setting is achieved, engage teeth, and tighten bolts to secure splash plate in
position.
Figure 3-5 Splash Plate Adjustment
MACHINE STARTUP
Refer to Section 4 for startup and operating procedures.