Owner's Manual

www.desatech.com
111244-01G 11
INSTALLATION
Continued
Figure 9 - Rough Opening for Installing
in Corner
Figure 8 - Rough Opening for Installing
in Wall
43
5
/
16
"
30
5
/
8
"
61
1
/
4
"
26
7
/
8
"
26
7
/
8
"
26
7
/
8
"
3/4" Off
The Floo
r
Minimum
15
1
/
4
"
Actual Framing
Height 26" 26
7
/8"
Front Width 26
3
/4" 26
7
/8"
Depth 14
1
/4" 15
1
/4"
1.
Frame in rough opening. Use dimensions shown
in Figure 8 for the rough opening. If installing
in a corner, use dimensions shown in Figure
10 for the rough opening. The height is 26
7
/8"
which is the same as the wall opening above.
2. If installing GA3450TA blower accessory, do
so at this time. Follow instructions included
with blower accessory.
Note: If not installing blower accessory, you
may wish to run electrical wiring to your
replace for future blower installation (see
Accessories, page 44). Use only approved
three-wire electrical wiring.

-


    

   -
cal outlet is included with the

    -
cal outlet supplied with the

Figure 10 - Attaching Fireplace to Wall Studs
Nailing
Flanges
Nails or
Wood
Screws
Wall Studs
Note: A qualied installer should make all electri-
cal connections.
3. Install gas piping to replace location. This
installation includes an approved exible gas
line (if allowed by local codes) after the equip-
ment shutoff valve. The exible gas line must
be the last item installed on the gas piping.
4. If you have not installed hood, follow instruc-
tions on page 6.
5. Carefully set replace in front of rough opening
with back of replace inside wall opening.
6. Attach exible gas line to replace gas regula-
tor. See Connecting Equipment Shutoff Valve
to Heater Control, page 17.
7. Bend four nailing anges on outer casing with
pliers (see Figure 10).
8.
Attach replace to wall studs using nails or
wood screws through holes in nailing ange.
9.
Check all gas connections for leaks. See Check-
ing Gas Connections, page 17.
10. If using optional brass trim kit, install the trim
after nal nishing and/or painting of wall.
See instructions included with brass trim ac-
cessory for attaching brass trim.
IMPORTANT: When nishing your rebox, combus-
tible materials such as wall board, gypsum board, sheet
rock, drywall, plywood, etc. may be butted up next to
the sides and top edge of the rebox. Combustible ma-
terials should never overlap therebox front facing.
WARNING: Do not allow any
combustible/noncombustible


WARNING: Do not allow
noncombustible materials to

