Installation Guide

11
F. Slide the half channel into place between the blocks and the top
of the opening. If necessary, temporarily apply a piece of tape
to the channel to hold it in place until the sealant sets.
G. Wait 24 hours before finishing the joints to allow the sealant
to cure.
Note: Please go to page 25 or 26 for joint nishing instructions to complete
your project.
E. Apply a 1/4” bead of sealant along the top inside leg of the sec-
ond half channel.
6E