Installation Guide

24
D. Push a spoon shaped finishing tool over the joints at a 45
°
angle to
collect the excess sealant and seal the joint. Periodically wipe the
sealant from the finishing tool.
E. Seal the vertical joints in the same manner. Carefully work the joint
intersections to create a smooth finish.
F. Let the sealant cure for 48 hours before putting any stress on the
panel.
G. Seal the perimeter joints with sealant.
Maintenance
An important part of the functional beauty of Seves
Glass Block products is that they are virtually main-
tenance free! There’s nothing to rot, rust, peel or
paint. All that is needed is an occasional wiping with
a damp, soft cloth on interior panels or a hosing on
exterior panels. With minimal attention, your Seves
Glass Block will remain sparkling and beautiful for
years!
If you need assistance
We hope these instructions are clear and answer
your questions about the installation of Seves Glass
Blocks and Finishing Units with the ProVantage
®
Glass Block Installation System. For more informa-
tion on Seves Glass Block visit our website at: seves-
glassblockinc.com.