Operating Guide

Note: All glass block panels are non-load bearing,
so adequate provisions must be made for support of
construction around the panel.
The joints of the Mortar I and Mortar II Systems utilize
DWUDGLWLRQDOLQVWDOODWLRQPHWKRGXVLQJDPRUWDUÀQLVK
for the classic “grid” look. Glass block sealant should
be used to seal the perimeter on both sides of the
panel.
Before you begin installing your glass blocks, decide
which installation method is right for your project.
The materials required for Mortar System glass block
installation are:
1. Seves Glass Block 3-in or 4-in Series Glass Block
2. Universal Mortar Spacers
3. Perimeter Channels - 4-in (4") or 3in (3")
(Mortar I System)
4. Expansion Strips
 []LQFSODWHGÁDWKHDGVFUHZVDSSUR[
three per lineal foot of perimeter channel)
(Mortar I System)
6. Panel reinforcing (Mortar II System)
7. Panel anchors (Mortar II System)
8. #12 x 1" zinc-plated pan head screws
(Mortar II System)
9. Glass Block white premixed mortar
10. Glass Block Sealant
11. White touch up paint (Mortar I System)
12. Latex paint, Weldbond
®
adhesive, or asphalt
emulsion depending upon application.
(Mortar II System)
2