4. Install The First Row
Note: If your project is framed on 3 or 4 sides, complete
Steps A thru K. If your project is framed on 2 sides, skip
to Step L.
A. Using a trowel apply
approximately a 1/2"
mortar bed to
the treated
curb or
ÁRRU
%:LWKRXWDSSO\LQJDQ\PRUWDUWRWKHÀUVWEORFNSODFH
an “L” spacer at the lower outside corner of the
block so that the spacer cross arm will be at the
bottom, between the glass block and the curb.
C. Place a “T” spacer at the other lower corner of the
block with the spacer cross arm up.
D. Slip a 16" long piece of trimmed expansion
strip between the block and jamb, and push
 WKHEORFNÀUPO\LQWRSODFH
E. Slip a “T” spacer between
the block and jamb so that
the cross arm is on top of
the block.
4A
4B
4C
4D
4E