Product Info

Installing beacons in the lane 8
© DESIGNA Verkehrsleittechnik GmbH 15
DESIGNA SMART MOVE_Installation_110_ENG.docx
Beacon box with holes
Fig. 9: Pre-punched holes in mounting plate
1 Hole for the cable duct (beacon/SBC connection, power supply)
2 Two holes for installing the beacon box mounting plate on the side of the
device (2x bolt CYL with internal hexagon M4X12 DIN 912 A2)
3 Two holes for installing the inner mounting plate
(2x bolt COUNTERSUNK M3X10 DIN 963 A2)
4 Two holes each at the top and bottom for the screw connection of the
beacon box
(4x bolt COUNTERSUNK with cross slot M3X6 DIN 965 A2)
The inner mounting panel is already screwed to the mounting plate
3
at
the factory (bolts COUNTERSUNK M3X10 DIN 963 A2).
4. Screw the beacon box to the lane device
2
.
To do so, use two bolts CYL with internal hexagon M4X12 DIN 912
A2.
5. Feed the serial communication and power supply cable from the
SBC through the appropriate holes
1
and the cable duct to the
beacon.
6. If the beacon is not yet installed in the beacon box, attach the
beacon with hook-and-loop tape to the underside of the mounting
plate.
7. Slide the casing body and the mounting plate of the beacon box
together.
8. Screw the casing body to the mounting plate of the beacon box with
two bolts each at the top and bottom (4x bolt COUNTERSUNK with
cross slot M3X6 DIN 965 A2)
4
.
8.1.2 Connecting the beacon box on the entrance /exit control terminal
For data transfer (serial communication) and the power supply, connect
the supplied cable to the SBC (Single Board Computer) and the beacon:
1. Plug the 6-pole micro-match connector into the beacon.