Product Info

8 Installing beacons in the lane
16 © DESIGNA Verkehrsleittechnik GmbH
DESIGNA SMART MOVE_Installation_110_ENG.docx
Fig. 10: Connection beacon 6-pole micro-match connector
2. For data transfer, plug the RJ11 connector into the preconfigured
port on the SBC.
3. Connect the open ends of the cable to the 5V supply of the SBC
(green cable +5V, brown cable GND).
8.1.3 Example: Installing the beacon in the DCT casing body
The second beacon box is located in the DCT casing body.
Power is supplied by a battery.
Fig. 11: Beacon in DCT casing body
1. Attach the beacon box with hook-and-loop tape behind the acrylic
glass panel of the DTC.