Product Info
Table Of Contents
- 1.1 About this manual 2
- 1.2 Explanation of signal words and symbols 2
- 1.3 Customer service & service 3
- 2.1 Intended use 4
- 2.2 Warnings and occupational health and safety 4
- 2.3 Safety standards 5
- 5.1 Technical requirements 7
- 5.2 SQL database configuration 7
- 5.3 System software 7
- 8.1 Installation 12
- 9.1 Configuration at the factory 18
- 9.2 Retrofitting the IN and OUT devices with SMART MOVE 18
- 9.3 Decommissioning and disassembly 19
- 9.4 Disposal 19
- 1 General
- 2 Safety
- 3 Scope of delivery
- 4 SMART MOVE system
- 5 System requirements
- 6 Technical Data
- 7 Configuring beacons
- 8 Installing beacons in the lane
- 9 Configuring the IN and OUT devices
- 10 Version overview
![](/manual/designa-verkehrsleittechnik/sm1/product-info-german-english/images/img-17.png)
8 Installing beacons in the lane
16 © DESIGNA Verkehrsleittechnik GmbH
DESIGNA SMART MOVE_Installation_110_ENG.docx
Fig. 10: Connection – beacon 6-pole micro-match connector
2. For data transfer, plug the RJ11 connector into the preconfigured
port on the SBC.
3. Connect the open ends of the cable to the 5V supply of the SBC
(green cable +5V, brown cable GND).
8.1.3 Example: Installing the beacon in the DCT casing body
The second beacon box is located in the DCT casing body.
Power is supplied by a battery.
Fig. 11: Beacon in DCT casing body
1. Attach the beacon box with hook-and-loop tape behind the acrylic
glass panel of the DTC.