Product Info

9 Configuring the IN and OUT devices
18 © DESIGNA Verkehrsleittechnik GmbH
DESIGNA SMART MOVE_Installation_110_ENG.docx
9 Configuring the IN and OUT devices
The beacon (radio transmitter) on the device is connected to the SBC
(Single Board Computer) via a serial interface. The parking data received
from the beacon is forwarded to the DESIGNA system via the SBC. The
DESIGNA system then sends the data to the SMART MOVE server.
The port on the SBC must be configured accordingly in order to access
the beacon.
9.1 Configuration at the factory
The IN and OUT devices are configured at the factory. In this case, the
serial interface (standard port 6) for SMART MOVE communication
between the beacon and the SBC is defined.
9.2 Retrofitting the IN and OUT devices with SMART MOVE
It is possible to subsequently integrate SMART MOVE into your parking
system. To do so, you require the corresponding licence. You can
request the license and the software update via the WinOperate
application. The devices are then configured for SMART MOVE through
the appropriate software update.
Requesting a licence
1. In WinOperate, open the Car park overview. (Refer to the separate
operator manual WinOperate/ Display overview: Car park/ Device
icon.)
2. In the context menu of the device icon, click Licence/ Request
licence.
A request file is then created.
3. Save the file.
4. Email the file to license@designa.com
.
The licence update file will be sent to you via email.
Importing the update
5. In the context menu of the device icon, click Licence/Licence update
and select the update file.
The device is configured with the function requested in the licence.
6. Restart the device.