Installation Instructions
3
3.
Test t the rail panel. Once a proper
t is ensured all cuts must be painted
prior to nal installation (Fig. 7).
Set the panel in place. Pre-drill the
screw holes using a 5/32" metal drill
bit. Secure using the supplied self-
tapping panel attachment screws
through the pre-drilled bracket holes
(Fig. 8) (2 screws per bracket).
Note: Rail ends may be painted with
any zinc rich primer or paint. For SATIN
BLACK touch-ups, we recommend
Rust-Oleum
®
*, Satin Canyon Black,
Color Code 249844. For BRONZE touch-
ups, we recommend Rust-Oleum
®
*,
Hammered Brown, Color Code 210880.
4.
Place a bracket cover over the rail
next to the bracket and slide the cover
toward the post until it snaps into place
(Fig. 9).
5.
Assemble the 2 piece post trim cover
by inserting one fastener in each trim
half (Fig. 10). Snap these in place (Fig.
11) concealing the post ange.
(Fig. 8)
(Fig. 7)
(Fig. 9)
(Fig. 10)
(Fig. 11)
*Rust-Oleum® is a registered trademark of
Rust-Oleum Brand Company.
LEVEL RAIL INSTRUCTIONS