PREMIUM VINYL RAILING (6' x 3') SKU# 1121660 Installation Instructions
Required Tools: • Drill • 1/8" Metal Drill Bit • Screwdriver • Measuring Tape • Hacksaw • PVC Vinyl Cement (Menards #172-4587) This product is compliant with NBCC, OBC, BOCA, UBC, and SBC building codes Included Post Components: Item Product Name Size Included Rail Components: Qty Item Product Name Size Qty A Steel Post Insert 37.5" High 1 E Top Rail Bracket 3.1" x 3.7" 2 B Vinyl Post Sleeve 4" x 4" x 38" 1 F Screw Length .75" 22 C Vinyl Post Cap 4" x 4" 1 G Screw Length 1.
Installation Tips: • When measuring for post installation, the measurement listed is from the center of one post to the center of the next, NOT the inside post distance from each post. • It may be necessary to cut the rails to balance the sections properly. Always cut equal lengths from each end of the rails so the spindles are well centered. • If trimming a section is needed, be sure to remove the steel insert before cutting.
6. Measure the distance between posts. Using a hack saw, cut the Top Rail (H) and Bottom Rail (L) to this length. Be sure to cut equally from either end. H 7. Affix the 2 Rail Support Blocks (N) to the Bottom Rail (L) using included screws (F). These blocks should be located at equal distances between the posts. (See Fig 3.) L L F F G x2 N 8. Slide Bottom Rail Brackets (K) over F F each side F Fig. 3 2 the Bottom Rail (L).
RECOMMENDED POST MOUNTING AND FASTENING RECOMMANDATIONS DE MONTAGE ET DE FIXATION DU POTEAU RECOMENDACIÓN DE MONTAJE Y DE FIJACIÓN DE LOS POSTES Post Poteau Poste 2.25″ 2.5″ 3.5″ (Octo) Wood Bois Madera 2″ Hex Lag * On Concrete Sur le ciment Distance du bord En cemento 4″ 1/4″ dia. Expansion 3″ Hex Lag * 4″ Distance du bord 2" Distancia al borde 2" #14 (1/4″ dia.) 1/4″ dia. Expansion 3″ Hex Lag * 4″ Distance du bord 3" Distancia al borde 3" Distance from edge 4" 1/4″ dia.