Installation Instructions
6. Measure the distance between posts,
following the angle of the stairs.
Using a hack saw, cut Top Rail (E),
Iron Bush (F), and Bottom Rail (J) to
this length if necessary.
7. Slide the Bottom Rail Brackets (I) on
to the Bottom Rail (J), and the Top Rail
Brackets (C) on to the Top Rail (E) and
Iron Bush (F). Lay these assemblies on
the stairs between the posts. Position the
brackets as shown and mark the angles
made by the intersection of each post.
(See Fig 3.)
8. Cut all 4 brackets using a hack saw
or circular saw. (See Fig 4.)
9. Position the Bottom Rail (J) at the
same height as the Bottom Rail on
previously installed railing, or about
2"above the stairs. (See Fig 5.)
Affix Bottom Rail Brackets to the
each post using screws (D).
(See Fig 6.)
10. Slide Spindles (G) into the holes
in the Bottom Rail (J). (See Fig 7.)
3
Fig. 11
Fig. 3
Fig. 4
Fig. 6
Fig. 7
Fig. 8
Fig. 9
Fig. 10
Fig. 5
11. Position Top Rail (E) and Iron Bush (F)
assembly with brackets (C) between
the posts, t hen slide spindles into
the Iron Bush. (See Fig 8.)
Affix the brackets to the posts
using Screws (D). (See Fig 9.)
12. Attach the Post Cap (B) using
PVC Glue. (See Fig 10.)
13. Snap Post Sleeve Ring (H)
over post at base.
(See Fig 11.)
H
A
A
J
I
C
G
G
E
B
D
x4
D
x5