PREMIUM VINYL RAILING (8' x 3') SKU# 1121661 Installation Instructions
Required Tools: • Drill • 1/8" Metal Drill Bit • Screwdriver • Measuring Tape • Hacksaw • PVC Vinyl Cement (Menards #172-4587) This product is compliant with NBCC, OBC, BOCA, UBC, and SBC building codes Included Post Components: Item Product Name Size Included Rail Components: Qty Item Product Name Size Qty A Steel Post Insert 37.5" High 1 E Top Rail Bracket 3.1" x 3.7" 2 B Vinyl Post Sleeve 4" x 4" x 38" 1 F Screw Length .75" 22 C Vinyl Post Cap 4" x 4" 1 G Screw Length 1.
Installation Tips: • When measuring for post installation, the measurement listed is from the center of one post to the center of the next, NOT the inside post distance from each post. • It may be necessary to cut the rails to balance the sections properly. Always cut equal lengths from each end of the rails so the spindles are well centered. • If trimming a section is needed, be sure to remove the steel insert before cutting.
6. Measure the distance between posts. Using a hack saw, cut Top Rail (H), Steel Top Rail Insert (I), Bottom Rail (L), and Steel Bottom Rail Insert (M) to this length. 7. Slide the Steel Bottom Rail Insert (M) into the Bottom Rail (L) and align the spindle holes. L 8. Affix the 2 Rail Support Blocks (N) to the Bottom Rail (L) using included screws (F). These blocks should be located at equal distances between the posts. (See Fig 3.) F F G x2 N F F F Fig. 3 2 each side F 2 Fig. 4 9.
RECOMMENDED POST MOUNTING AND FASTENING RECOMMANDATIONS DE MONTAGE ET DE FIXATION DU POTEAU RECOMENDACIÓN DE MONTAJE Y DE FIJACIÓN DE LOS POSTES Post Poteau Poste 2.25″ 2.5″ 3.5″ (Octo) Wood Bois Madera 2″ Hex Lag * On Concrete Sur le ciment Distance du bord En cemento 4″ 1/4″ dia. Expansion 3″ Hex Lag * 4″ Distance du bord 2" Distancia al borde 2" #14 (1/4″ dia.) 1/4″ dia. Expansion 3″ Hex Lag * 4″ Distance du bord 3" Distancia al borde 3" Distance from edge 4" 1/4″ dia.