Workshop Manual

EPA07/10 DD PLATFORM WORKSHOP MANUAL - ENGINE
8.5 INSTALLATION OF AIR INTAKE MANIFOLD
Install a s follows:
1. Install six gaskets to the air intake manifold.
2. Install t hirteen anged screws and isolator gaskets to t he air intake manifold. Secure air
intake manifold to cylinder head. Torque the bolts to 25 N·m (18 lb·ft).
3. Re-install electrical harness connectors t o appropriate sensors.
4. Install oil coolant module. Refer to section 26.3.
5. Install fuel module. Refer to section .
6. Install cold boost pipe. Refer to section 7.4.
7. Install exhaust gas recirculation (EGR) mixer pipe and delivery pipe. Refer to section .
8. Install the poly-V-belts. Refer to section 40.3.
9. Prime fuel system. Refer to section .
10. Fill the c ooling system. Refer to OEM specications.
All information subject to change without notice.
DDC-SVC-MAN-0081 20 10 Copyright © 2010 DETROIT DIESEL CORPORAT ION 8-9