Workshop Manual

EPA07/10 DD PLATFORM WORKSHOP MANUAL - ENGINE
3. Remove the EGR Mixer Pipe (2) from the cold boost pipe (1). Refer to section .
4. Remove the Exhaust Gas Crossover Tube (2), gasket (4), venturi (6), lifting eye (8) and
connecting tube (1) from the EGR cooler.
All information subject to change without notice.
DDC-SVC-MAN-0081 20 10 Copyright © 2010 DETROIT DIESEL CORPORAT ION 9-15