Workshop Manual
14.3 INSTALLATION OF THE DD13 CYLINDER HEAD
21. Install the mixer pipe. Refer to section .
22. Install the venturi. Refer to section .
23. Install the fuel injectors. Refer to section .
24. Install the engine brake solenoids and injector harness.
25. Install the amplification needle and pressure limiting valve (PLV). Refer to section .
26. Install the high pressure feed lines from high pressure pump to common fuel rail.
Refertosection.
27. Install the injector feed lines from fuel rail. Refer to section .
28. Connect the coolant temperature sensor harness.
29. Install the turbocharger inlet pipe.
30. Install any components that were removed and fill with required fl uids as recommended.
Refer to OEM guidelines.
31. Set the valve lash and engine brake. Refer to section 14.15.
ENGINE EXHAUST
To avoid injury from inhaling engine exhaust, always
operate the engine in a well-ventilated area. Engine
exhaust is toxic.
32. Install the rocker cover. Refer to section 1.4.
33. Fill the cooling system.
34. Prime engine lubrication system. Refer to section 27.1.
35. Start the engine and check for fuel, coolant or oil leaks.
36. Shut down the engine.
All information subject to change without notice.
14-14 DDC-SVC-MAN-0081 201 0 Copyrig ht © 2010 DETROIT DIESEL CORPORATION