Workshop Manual
26.3 INSTALLATION OF THE OIL C OOLANT MODULE
14. If open, close the drain plug on the cylinder block located next to the oil coolant module.
NOTE:
Before insta lling coolant crossover pipe, check the coupler hose for damage. Replace
as necessary.
15. Install EGR coolant delivery pipe a nd hose to oil coolant module and tighten the two
hose clamps.
16. Install the two EGR coolant delivery pipe bolts to the oil coolant module and torque to
30 N·m (22 lb·ft).
17. Install cold boost pipe and four bolts to intake manifold. Torque bolts to 12 N·m (9 lb·ft).
18. If removed, install mixer tube to cold boost pipe with three bolts. Torque 30 N·m (22 lb·ft).
19. If removed, install the intake throttle valve to cold boost pipe. Torque bolts to 30 N·m
(22 lb·ft).
20. Fill the coolant system.
21. Prime engine lubrication system. Refer to section 27.1.
All information subject to change without notice.
26-8 DDC-SVC-MAN-0081 201 0 Copyrig ht © 2010 DETROIT DIESEL CORPORATION










