Workshop Manual

42.3 CLEANING THE CYLINDER BLOCK
42.3.2 Inspection of Main Bearing Bores
Perform the following steps for main bearing bore inspection:
1. Install the main bearing caps in their original positions. Lubricate the cap bolt threads and
head contact surfaces with a small quantity of clean engine oil
Figure 42-7 Main Bearing Cap Torque Sequence
Bolt Length DD13 DD15 DD16
Main Bearing Cap Bolt 175.5 mm (6.909 in.) 200.5 mm (7.894 in .) 200.5 mm (7.894 i n.)
Table 42-2 Main Bearing Cap Bolt Length
2. Install the main cap bolts and torque bolts to 50 N·m (37 lb·ft).
3. Torque the main cap bolts again to 150 N·m (103 lb·ft).
4. For the DD13, nal torque the main cap bolts to 300 N·m (221 lb·ft). Then, torque turn
the bolts an additional 90°.
5. For the DD15, nal torque the main cap bolts to 250 N·m
(184 lb·ft). Then, torque turn the bolts an additional 90°
and again torque turn the bolts an additional 90°.
6. Measure the main bearing bores using dial bore gauge which has a dial indicator calibrated
in 0.0001 in increments. Set the cylinder bore gauge on zero in master setting xture.
NOTE:
Dial bore ma ster setting xture should b e used to zero the cylinder bore gauge.
All information subject to change without notice.
42-14 DDC-SVC-MAN-0081 201 0 Copyrig ht © 2010 DETROIT DIESEL CORPORATION