Specifications
Service Training
Page 33
Section 4.1
09.06
4.1.2.8 CYLINDER HEAD
REMOVING THE CYLINDER HEAD
- With the engine cool, slacken the cylinder head bolts evenly and in steps in the reverse order as given
in the schematic "Cylinder head bolt tightening sequence".
DETERMINING THE CYLINDER HEAD GASKET
NOTE: For the adjustment of the gap, there are 3 different cylinder head gaskets, which identifiable
by holes.
- Place the dial gauge along with spacers 100750 on
the sealing surface of the cylinder block and set the
dial gauge to "0".
- Turn the piston to TDC and note the projecting length
of the piston at the points of measurement.
- Compare the largest value with the table and determine
the corresponding cylinder head gasket.
Projecting length Identification of
of piston cylinder head gasket
0.33 - < 0.55 mm 1 hole
0.56 - < 0.65 mm 2 holes
0.66 - 0.76 mm 3 holes